1 Ano atras - Traduzir

Introduction
The Paste Filling System have a color touch screen control system, driven by three servo motors, and are characterized by convenient operation, high stability and high packaging efficiency. Secondly, we also have the function of positioning and stopping, which has the performance of not sticking the knife and not wasting the film. Finally, our products are cheap and high-quality, which is deeply loved by our customers.
Feature
The Paste Filling System add garbage recycling devices to make the packaging more beautiful. Compared with the traditional folding film packaging machine, we can save about 20% - 30% of the materials. Secondly, our products have motor brake control, and the equipment is very responsive. Finally, our products can automatically control the temperature to ensure the shrinkage quality.
Technical Parameters
Production Capacity: 1000KG/Shift; Oxide Weighting Accuracy:锛?.1%
Acid Weighting Accuracy:锛?.15%; Water Weighting Accuracy:锛?.15%
Paste Mixing Time: 20锝?5min/T; Paste Output Temp.锛?0鈩?/p>
Package List (FOUR MACHINES)
No.NameQtyRemarks
1Main Machine System1 set鈼?Cooling Water Pipe Around The Main Machine Tank And Bottom.
鈼?Stainless Steel Used For Main Main Tank & Paste Blade
鈼?Main Machine Soft Start
2Water, Oxide Weighting System1 set鈼?Water, Acid And Oxide Will Be Metered Independently By Highly Accuracy Metering System Which Controlled By PLC Operation For Auto Oxide Feeding, Weighting, Oxide Output, HMI Could Set The Weighting Parameters Beforehand.
鈼?Acid And Water Measuring Tank Has Calibration Mark, Transparent Material
3Paste Storage System1 set鈼?1 pc Fixing Paste Collection Silo
4Electrical Control System1 set鈼?Siemens S7-1200
鈼?Fully automatic operation, monitor in actual time, when unusual technical parameters and operation fault happens, machine will alarm and shows the reason and solution.
鈼?Environmental friendly fans controlled by PLC.
5Cables1 set鈼?Electrical Control System To Machine.
6Cable Supporter1 set
7Paste Mixer Steel Platform1 set鈼?Buyer Should Manufacture As Per Drawings Which supplied By The Manufacturer.
8Environmental Friendly Device, Moisture Dust Exhauster.1 set鈼?The Offgas Density Could Meet The National Standard After Treated By Moisture Dust Exhauster.
鈼?One set moisture dust exhauster include: 2pcs PP towers, 1pcs spray pump, 1pcs invert fans and the pipes between moisture exhauster and main machine.
Paste Mixer Installation, Pipe Connection And Cable Connection
No.DescriptionDutyREMARKS
BUMA
1Main Power To Machine Control Panel鈽?/p>
2Cooling Tower To Machine Cooling Water Input鈽?/p>
3Machine Cooling Water Output To Recycled Tank鈽?/p>
4Main Machine Installation
鈽?/p>With BU Support
5Cable Connections Of The Machine
鈽?/p>With BU Support
6Compressed Air Pipe To "T" Connection鈽?/p>
7Acid And Water Pipe To Machine Connector鈽?/p>
8Lead Oxide Pipe To Machine Connector
鈽?/p>With BU Support
9Signal Connection Between Paste Mixer And Lead Oxide Device
鈽?/p>
10Foundation鈽?/p>
MA supply drawings
11Commissioning
鈽?/p>With BU Support
Packing List And Supply
No.PartSupplierUsage
1Main MotorChinaMain Machine
2Reduction BoxChinaMain Machine
3PLCSiemensControl Part
4HMISiemensControl Part
5Acid ValveJapanAcid Control Part
6Weighting SensorChinaAcid, Water, Oxide Weighting
Inspection Standard And Other Items
1. How To Inspect: MA & BU should both join, The Machine Should Running Continuously for ONE month, Every Performance Should Reach The Inspection Standards.
2. After Installation and Commissioning Finished, BU could use professional device to check data and confirm that the machine could satisfy the production and technical requirements of BU.
3. Quality Guarantee: The Warranty Time for main machine is ONE year, for Anti-Acid Parts THREE years, The Warranty Time Started From Inspection Date. In Normal Working Conditions, If Materials, Key Parts And Installation Quality Problems Cause The Machine Faults, MA will in charge of the maintaining, repairing or replacing free of charge.
4. Happens, MA should Be In BU plant Within 24hrs.
5. When The Machine Reach BU place, BU should estimate the machine first then installing/commissioning OR trial running.
Quality Guarantee AND Services
1. MA supply Operation Manual, Electrical Drawings And Key Parts List (with Introductions), Qualified Certification.
2. Warranty Time ONE year, repair for life time.Plate Making Equipment factory
website:http://www.xinxu-power.com/lea....d-acid-battery-makin

Plate Making Equipment Manufacturers Suppliers in China - XINXU
www.xinxu-power.com

Plate Making Equipment Manufacturers Suppliers in China - XINXU

XINXU is one of the most professional plate making equipment manufacturers and suppliers in China. We warmly welcome you to buy cheap plate making equipment made in China here from our factory. For quotation, contact us now.